Skip to main content

Studen Kladenets

Studen Kladenets

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Studen Kladenets
Stenata na yazovir Studen kladenec.JPG
Studen Kladenets Dam
Coordinates41°38′28″N 25°32′48″E / 41.64111°N 25.54667°E / 41.64111; 25.54667Coordinates: 41°38′28″N 25°32′48″E / 41.64111°N 25.54667°E / 41.64111; 25.54667
Lake typereservoir
Primary inflowsArda, Varbitsa River
Primary outflowsArda
Catchment area3,707 km2 (1,431 sq mi)
Basin countriesBulgaria
Max. length29 km (18 mi)
Max. width1.5 km (0.93 mi)
Surface area27.8 km2 (10.7 sq mi)
Max. depth60 m (200 ft) (from dam height)
Water volume388,000,000 m3 (1.37×1010 cu ft)
Surface elevation227 m (745 ft)

The Studen Kladenets Reservoir (язовир „Студен кладенец") is the third largest reservoir by volume in Bulgaria after Iskar Dam and Kardzhali Dam. It is situated on the river Arda, and is created behind the Studen Kladenets dam, 30 km south-east of the town of Kardzhali. There are another two dams of the Arda - Kardzhali Dam to the west (upstream) and Ivaylovgrad Dam to the east (downstream).

The reservoir has a total volume of 388 million m3 and a drainage basin of 3,706 km² and is 29 km long. It is situated at an average 227 m above sea level, its dam being 338 m long and 67.5 m high. The top of the dam consists of nine spillways, each one being 10.5 by 5 m. "Studen Kladenets" Hydroelectric Power Plant is situated appr. 1 km downstream of the dam. Initially the HPP had four Francis-type turbines, 15 MW each. А project for reconstruction and upgrading the HPP with another 16 MW turbine and a smaller eco-turbine underwent and after the completion, the total output reached 85 MW with annual production of 165 GWh of electricity.

Studen Kladenets reservoir is an attractive place for fishermen, where rudd is caught in great numbers. "Studen Kladenets" stands for "a cold well" in Bulgarian .

History[edit]

The initial plans for the construction of a dam on the Arda date to as early as 1948. Construction began in 1955 and was completed in 1957. The HPP started electricity production in 1958.

External links[edit]

Comments

Popular posts from this blog

Jacques Rancière

Electronic keyboard

Wikipedia talk:WikiProject Countries/Proposal 1